skip to main
|
skip to sidebar
Monday, April 27, 2009
Idlers put in place
Steel tube welded in Place
A washer was brazed in place to make the drilled out hole square ,then the steel tube was brazed in place.The bolt for the idlers will go inside the tube,very strong
reworking the idlers
Monday, October 27, 2008
New Wireless speedometer
Working more in the Shop
Vent in Position
Aluminum Vent lighter
Older Posts
Home
Subscribe to:
Posts (Atom)
Blog Archive
▼
2009
(3)
▼
April
(3)
Idlers put in place
Steel tube welded in Place
reworking the idlers
►
2008
(29)
►
October
(8)
New Wireless speedometer
Working more in the Shop
Vent in Position
Aluminum Vent lighter
Old Plastic vent ,new Alumnium vent
Glove layup
Winterizing helmet
Winter Gloves
►
July
(3)
The Red Devil
Little Speedster
Tom testing new fenders,full touring kit
►
May
(8)
Roof fits in trunk when not in use
Removable Velomobile Roof
Student & Master John Tetz & Chris Spollen
Pop Up Head Light Demo
The Kids react they post their bike ideas
John Tetz demos his velomobile
The Machines outside before lecture
John Tetz Lecture SI Museum
►
February
(9)
Museum Show Soon
Faired Zote Foam Trike
Spollen Brothers tinkering
Two and three wheel machines
Many Ideas are Kicked Around
Front View of Unfaried Trike
Trike out of Shell
Side View Front Wheel Drive
Custom Handel Bar
►
January
(1)
Over the years
►
2007
(17)
►
December
(2)
Testing Trike Buble
Old Zote Foam Streamliner
►
November
(15)
Second Attempt at a Flip up Handel Bar
Process to : Create Flip Up Handel Bar
Warm .Dry .Visable ,and Streamlined
New Handel Bar Inside Fairing
Getting the Handel Bar Right
Semi Faired Trike
Thinking Of A Faired Trike
Wasp Logo
Wasp Logo
The Wasp Semi- Faired
The Wasp Unfaired
The Wasp Fully Faired
The V-Bee
Delta Trike Fairing
Delta Trike Test Run
About Me
Chris
View my complete profile